On the Critical Path Trailer

On the Critical Path Trailer (1971)

01 January 1971 Factual 22 mins

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Watch the official On the Critical Path 1971 trailer in HD below or find more On the Critical Path videos on Vidimovie.

Watch Full Movies Online

Sorry, we can't find the movie trailer you're looking for.

Either a trailer for this movie has not been released yet, or it was removed following a request from the copyright holder.

Find more trailers

International Titles

Industrie électronucléaire Trailer

International Releases Dates

Canada 01 January 1971

Production Companies

Similar Trailers

If you liked the On the Critical Path trailer, you may like these ones:

Atomic Hope: Inside the Pro-Nuclear Movement Trailer (2023)

17 February 2023

Is nuclear energy the solution to the climate crisis? Whether it is the only carbon-neutral technology capable of tackling the crisis or a fatally convenient stopgap, time is running out.

Decommissioning Fukushima 2024: Roadmap on the Brink Trailer (2024)

29 June 2024

Thirteen years since the Fukushima Daiichi nuclear accident, the government's plan to decommission the plant is at a crossroads.

Kim Jong-un: The Unauthorized Biography Trailer (2015)

23 September 2015

A journey through several countries to find those who really know Kim Jong-un, North Korea's leader, in an attempt to profile a contradictory dictator who seems to rule his nation with both disturbing benevolence and cold cruelty while being worshipped as a living god by his subjects in exalted displays of ridiculous fanaticism.

Atomic: Living in Dread and Promise Trailer (2015)

08 August 2015

Using only archive film and a new musical score by the band Mogwai, Mark Cousins presents an impressionistic kaleidoscope of our nuclear times – protest marches, Cold War sabre-rattling, Chernobyl and Fukishima – but also the sublime beauty of the atomic world, and how x-rays and MRI scans have improved human lives.

Nuclear Now Trailer (2023)

28 April 2023

With unprecedented access to the nuclear industry in France, Russia, and the United States, Nuclear Now explores the possibility for the global community to overcome the challenges of climate change and energy poverty to reach a brighter future through the power of nuclear energy.

Inside Chernobyl with Ben Fogle Trailer (2021)

03 March 2021

Ben Fogle spends a week living inside the Chernobyl Exclusion Zone, gaining privileged access to the doomed Control Room 4 where the disaster first began to unfold.

Uranium Drive-In Trailer (2013)

25 May 2013

A new uranium mill -- the first in the U.S. in 30 years -- would re-connect the economically devastated rural mining community of Naturita, Colorado, to its proud history supplying the material for the first atomic bomb.

We Are the Guinea Pigs Trailer (1980)

01 April 1980

Farmers and parents of young children, who live in the Harrisburg, Pa., area, discuss their fears of radioactive contamination from the Three Mile Island nuclear reactor accident in 1979.

Thorium, the Far Side of Nuclear Power Trailer (2016)

27 September 2016

Ever heard of the Thorium molten salt reactor? That's hardly surprising, as for 70 years, it has been inexplicably kept under wraps by the nuclear industry, despite the fact it could revolutionise energy production.

Letter from Tokyo Trailer (2018)

25 September 2018

Letter from Tokyo is a documentary film that looks at art, culture and politics in Tokyo, Japan. Shot over three months during the summer of 2018, and with a particular focus on grass roots arts initiatives, the use of public space, and queer politics, the film provides a snapshot of Japan’s capital in the run up to the 2020 olympics.

Decommissioning Fukushima: The Battle to Contain Radioactivity Trailer (2014)

01 January 2014

TEPCO's Fukushima Daiichi Nuclear Power Plant is the site of one of history's worst nuclear disasters: the meltdown of three nuclear reactors.

Seabrook 1977 Trailer (1978)

01 January 1978

In April 1977, the small coastal town of Seabrook, New Hampshire became an international symbol in the battle over atomic energy.

Popular movie trailers from 1971

These some of the most viewed trailers for movies released in 1971:

The Fourth Victim Trailer (1971)

10 March 1971

A wealthy Englishman finds his third wife dead. After the police discover that his first two wives had also died suddenly, an investigation is launched.

Twenty Thousand Dollars for Every Corpse Trailer (1971)

03 May 1971

Dale and Helen Brais are a marriage of farmers who subsist on what little they manage to get from their land.

O Bolão Trailer (1971)

14 January 1971

Willy Wonka & the Chocolate Factory Trailer (1971)

29 June 1971

When eccentric candy man Willy Wonka promises a lifetime supply of sweets and a tour of his chocolate factory to five lucky kids, penniless Charlie Bucket seeks the golden ticket that will make him a winner.

Riuscirà il nostro eroe a ritrovare il più grande diamante del mondo? Trailer (1971)

23 June 1971

Jimmy Logan, a detective, tries to retrieve a diamond from the British crown stolen by the traitorous chief of the English Secret Service.

Duck, You Sucker Trailer (1971)

29 October 1971

At the beginning of the 1913 Mexican Revolution, greedy bandit Juan Miranda and idealist John H. Mallory, an Irish Republican Army explosives expert on the lam from the British, fall in with a band of revolutionaries plotting to strike a national bank.

The Specialist Trailer (1971)

21 August 1971

An amusingly drawn cartoon about a highly proficient lady bricklayer, graduate of Specialists' School, whose work takes her high up in the world, and her erstwhile friend, whose equally dedicated professionalism brings him lower.

Straw Dogs Trailer (1971)

25 November 1971

David Sumner, a mild-mannered academic from the United States, marries Amy, an Englishwoman. In order to escape a hectic stateside lifestyle, David and his wife relocate to the small town in rural Cornwall where Amy was raised.

The Devils Trailer (1971)

16 July 1971

In 1634 France, charismatic Father Urbain Grandier becomes the target of a sexually obsessed nun’s witchcraft accusations, which corrupt church and state officials are all too happy to exploit.

A Prison Should Be Dark Trailer (1971)

01 January 1971

Kafkaesque story of man arrested and imprisoned for no reason, and then – in impressionistic style – forced to reflect on his life.

Journey to Murder Trailer (1971)

01 January 1971

Television movie that consists of two episodes from the UK TV series Journey to the Unknown (1968): Do Me a Favor and Kill Me (1968) and The Killing Bottle (1969).

Krkonošské hromování Trailer (1971)

24 December 1971

Pretty Aninka is terribly lazy, she just wants to sleep, her mother tries in vain to get her to do any work.

Comments

Have you watched On the Critical Path yet? What did you think about it?